BlockSun

See your home's improvement plan — free, no signup

BlockSun scores every home in its coverage area for improvement opportunity and builds a ranked plan for the one you pick: which projects are worth doing, what each costs at your house, what it saves per year, and roughly what it would be per month if financed. Estimates come from the home's measured roof footprint and lot geometry plus public assessor records — not a city-wide average — and the plan will tell you when the honest answer is that your home is already in good shape.

When you want real numbers, we pass the request to vetted local providers. It is free, there is no obligation, and you only share contact details for the projects you actually pick.

What is in a home plan

How to read the priority

High means condition-driven: something is near the end of its life and deferring it tends to cost more than doing it. A roof is the clearest case — a failure takes ceilings and insulation with it. Medium is usually savings-driven: worth doing on a sensible timeline, not an emergency. Low is discretionary — a real improvement to how you live, with no penalty for waiting. Do the high-priority work first even when a lower one has a better headline saving; a failed roof will damage whatever you installed underneath it.

What BlockSun covers, and what it typically costs

ProjectTypical cost
SolarInstalled cost runs about $3.05 per watt — roughly $12,000–$27,500 for the 4–9 kW system most homes need.
New roofInstalled cost runs about $3.50–$30.00 per square foot depending on the material.
PoolMost projects run $45,000–$85,000.
HVACMost projects run $8,000–$18,000.
BatteryMost projects run $12,000–$22,000.
WindowsMost projects run $9,000–$22,000.
TurfTypically about $12.00 per square foot installed.
FencingTypically about $45 per linear foot installed.

Ranges are regional planning figures. Your home's number depends on its roof area, lot size, age and existing equipment — which is exactly what the plan works out for you.

How to tell whether you need each project

Solar

A rooftop solar system converts daylight into electricity your home uses first, exporting whatever is left over to the grid. In California the economics changed materially under NEM 3.0: power you use as it is generated is worth the full retail rate you would otherwise pay, while power you export earns roughly a sixth of that. That single fact should drive how big a system you buy and whether you add a battery.

Signs it is time:

What moves the price on your home:

Questions worth asking a contractor:

How long it takes: Typically 2–4 months from signing to switch-on, most of it permitting and utility interconnection rather than installation, which is usually 1–3 days on the roof.

The part nobody volunteers: A bigger system is not automatically a better one. Under NEM 3.0 an array sized to fill your roof rather than to match your usage sells its surplus at a fraction of what it is worth to you. If a proposal is much larger than your consumption, ask why.

New roof

A re-roof strips the existing covering, repairs or replaces damaged sheathing, and installs new underlayment and roofing material. It is the project most likely to be genuinely urgent, because a roof that fails takes the ceilings, insulation and sometimes the framing with it — and it is the project where deferring costs the most.

Signs it is time:

What moves the price on your home:

Questions worth asking a contractor:

How long it takes: Most single-family re-roofs run 2–5 days on site, with a few weeks' lead time for permits and material.

The part nobody volunteers: Get the sheathing contingency in writing before work starts. The most common way a roofing quote grows is a mid-job discovery with no agreed price attached to it.

Pool

A new in-ground pool is excavation, structure, plumbing, electrical, decking and equipment — closer to a small construction project than to an appliance purchase. It is a lifestyle decision, and it carries ongoing cost that the build price does not show.

Signs it is time:

What moves the price on your home:

Questions worth asking a contractor:

How long it takes: Commonly 2–4 months from breaking ground to swimming, longer on difficult sites or during permit backlogs.

The part nobody volunteers: Budget for the second number. Running a pool typically costs $1,500–$4,000 a year before any repairs, and resurfacing comes due every 10–15 years. Ask any builder to put the ongoing cost in writing next to the build price.

HVAC

Replacing heating and cooling means a new condenser and air handler — or, increasingly, a heat pump that does both — usually with duct repairs and a new thermostat. Sizing is the part that matters most and the part most often got wrong.

Signs it is time:

What moves the price on your home:

Questions worth asking a contractor:

How long it takes: A straight equipment swap is usually 1–2 days; adding or reworking ducts extends it to 3–5.

The part nobody volunteers: Oversized equipment is a real and common failure. A unit that is too large cools quickly, shuts off before it has removed humidity, and short-cycles itself to an early death. If a contractor sizes by square footage alone rather than a load calculation, keep looking.

Battery

A home battery stores energy — from your solar array or from cheap off-peak grid power — and discharges it when power is expensive or unavailable. Under NEM 3.0 it is what turns a solar array from an export business into a self-consumption one, which is where the value is.

Signs it is time:

What moves the price on your home:

Questions worth asking a contractor:

How long it takes: Usually 1–2 days on site once permits are issued; permitting and utility approval typically add 4–10 weeks.

The part nobody volunteers: Backup and bill savings are two different products. A battery sized to shave your evening peak may not carry your house through a long outage, and one sized for outages is often poor value if you never lose power. Decide which you are buying before comparing quotes.

Windows

Window replacement swaps single-pane or failed double-pane units for modern insulated glass. It is usually a comfort, noise and condensation project first and an energy project second — the payback on energy alone is long, and honest sellers say so.

Signs it is time:

What moves the price on your home:

Questions worth asking a contractor:

How long it takes: Manufacturing lead time is usually 4–8 weeks; installation of a whole house is typically 2–4 days.

The part nobody volunteers: Be skeptical of energy-savings claims used to justify the price. Windows are worth doing for comfort, noise, light and how the house works to live in. If the pitch is built entirely on utility savings, the math rarely survives contact with your actual bill.

Turf

Artificial turf replaces lawn with a synthetic surface over a compacted, draining base. In a drought-prone climate it removes irrigation and mowing entirely; the trade-off is a significant up-front cost and a surface that runs hotter than grass in direct sun.

Signs it is time:

What moves the price on your home:

Questions worth asking a contractor:

How long it takes: Most residential installs are 2–5 days depending on area and how much demolition is needed.

The part nobody volunteers: Convert the space you use, not the space you have. Turf is priced by the square foot, so the difference between covering a whole lot and covering the lawn you actually walk on is the difference between a sensible project and an eye-watering one.

Fencing

New fencing replaces or adds a boundary structure — posts set in concrete, a frame, and the infill material. Most of the cost is in linear feet and post depth, and most of the disputes are about where the line actually runs.

Signs it is time:

What moves the price on your home:

Questions worth asking a contractor:

How long it takes: A typical residential run is 2–4 days, plus post-concrete cure time before gates are hung.

The part nobody volunteers: Settle the boundary before anyone digs. A fence built even slightly over the line is the single most expensive mistake in this category, because the remedy is taking it down again. In many places the neighbor shares the cost of a boundary fence if you agree in advance.

Where BlockSun works

Coverage today is the Los Angeles South Bay and Palos Verdes Peninsula: Rancho Palos Verdes, Palos Verdes Peninsula, Palos Verdes Estates, Rolling Hills Estates, San Pedro, Torrance, Redondo Beach, Lomita and Harbor City.

How BlockSun makes money

Homeowners never pay us. When you ask for a quote, that introduction is what we sell to the provider — which is the whole reason the plan can be free and the reason we say so plainly here. It also sets a limit we hold to: a provider cannot pay to change your home's ranking or its numbers, because the ranking is computed from the property. If we told you to replace a roof that did not need replacing, the estimate would be worth nothing to you and the lead would be worth nothing to them.

Frequently asked

Is BlockSun free for homeowners?

Yes. Looking up any home, seeing its full ranked plan, and comparing costs and savings is free and needs no signup. You only share contact details when you ask for a quote, and that request goes to vetted local providers.

How does a block group-buy lower the price?

A contractor doing several homes on one street shares mobilization, permitting and travel across all of them, and skips the cost of finding each customer. BlockSun aggregates that demand and passes the saving back as tiered discounts that deepen as more neighbors join.

Where do the cost and savings estimates come from?

Cost is derived from each home's own measured geometry — roof footprint, lot area, perimeter — combined with current regional pricing per square foot or a project cost band. Savings use current local utility rates. They are planning estimates, not bids; a licensed local contractor confirms the real figure for free.

Does BlockSun sell my information?

No. Nothing is shared until you explicitly request a quote, and then only with providers who can do the specific project you picked.

Which home projects does BlockSun cover?

Solar, a new roof, HVAC, windows, battery storage, pools, artificial turf and fencing — each scored against the individual home rather than offered as a blanket pitch.

Ask an AI about this page

Getting a second opinion is sensible before spending five figures on your home. These open an assistant with the question already written:

ChatGPT · Claude · Perplexity · Google AI Mode